
Neubau des ETZ Elisabeth Krankenhaus in Tilburg
Vom Keller bis zum Dachgeschoss kamen Kabeltragsysteme und technische Installationslösungen im gesamten ETZ-Projekt zum Einsatz und sorgen für eine sichere und effiziente Kabelführung.
New ETZ Elisabeth Hospital building in Tilburg
A future-proof hospital delivered quickly and in partnership – thanks to products from OBO Bettermann
A large-scale new building is being constructed for Elisabeth-TweeSteden Hospital (ETZ) in Tilburg, the Netherlands, as an extension to the existing hospital complex. The project is characterised by tightly organised execution with a speedy construction schedule. Started in summer 2025, the building will be completed by the end of 2026.










Planning required precise coordination of the different disciplines, with continual efficiency, progress and quality monitoring.
The focus was on the public interest – a future-proof healthcare environment where functionality and reliability are essential.
OBO Bettermann is contributing to the complete cable infrastructure of this project. From the basement to the top floor, the entire building was equipped with Kabeltragsystemen and technical installation solutions.
The project was executed in close collaboration with installation partner ULC. This collaboration was based on an integrated approach, where engineering, logistics and mounting were closely aligned. OBO Bettermann was selected based on an existing, trusted business relationship and the proven technical expertise of both our company and our colleagues on the construction site. Thanks to short communication channels and practical support during execution, we were able to respond flexibly to the project dynamics.
Turnkey solutions from OBO Bettermann
In this project, cable management was considered as a whole – from selection to planning, all the way through to delivery and mounting on-site.
The combination of standard solutions with project-specific applications resulted in a consistent, efficient installation.
Various systems were used in the ETZ project, to ensure safe and efficient cable routing throughout the entire building.
Cable trays , cable trays, OBO Profilschienen , Quick clips, Wandkanäle , cable distributors and Verteilerdosen were installed, among other products.
Tailored to the functional requirements of the different hospital areas, the solutions were implemented on every storey. One key part of this project is the special products developed.
A rapid construction schedule, intensive collaboration and an integrated approach resulted in a future-proof hospital building where technology and functionality work together in harmony. It is a project that focuses not only on technology, but also on the common goal: to establish a high-quality healthcare environment.

Project information
- Product categories
- InstallerULC Installatiegroep
- Location and countryTilburg - Netherlands
- Construction durationSummer 2025 until winter 2026
- PhotosOBO Bettermann